We held a Local Management Committee LMC0 meeting today at Aspin Consulting in Derby to kick off our latest KTP Project KTP10102 with Rogers Structural Investigations Ltd. The project is based around the design, deployment and data analysis of unmanned variable vehicles as a platform for multi sensor analysis of transportation structures such as difficult […]
Prof Paul Stewart
Vacancy: Instrumentation & Control Design Engineer – KTP ASSOCIATE Based in: Chesterfield @DerbyUniIISE
Knowledge Transfer Partnerships Kick start your career with a KTP Instrumentation & Control Design Engineer – KTP ASSOCIATE Based in: Chesterfield £22 up to £30K per annum depending on qualifications plus £4K Personal Development Budget and Management Training Programme Kick start you career with KTP! Are you interested in shaping the future of Sewage Treatment […]
Energies Journal: Special Issue Electrical Power and Energy Systems for Transportation Applications latest papers
Special Issue Electrical Power and Energy Systems for Transportation Applications Article: A Novel Grouping Method for Lithium Iron Phosphate Batteries Based on a Fractional Joint Kalman Filter and a New Modified K-Means Clustering Algorithm by Xiaoyu Li, Kai Song, Guo Wei, Rengui Lu and Chunbo Zhu Energies 2015, 8(8), 7703-7728; doi:10.3390/en8087703 Article: Stability Analysis for […]
Research Fellow in Electronic, Control and Systems Engineering vacancy @DerbyUniIISE
Research Fellow in Electronic, Control and Systems Engineering (fixed term to October 2018) – Ref: 5298 Institute for Innovation and Sustainable Engineering University of Derby £23,386 – £31,342 per annum (pay award pending) (Temporary – Full Time) Work Pattern: 37 hours, Monday to Friday Closing date: 21 September 2015 Proposed dates of employment: November 2015 […]
Phase 2 of University of Lincoln’s School of Engineering building initiated
In 2009 I joined Lincoln University as Founding Head of the new School of Engineering, delivering a new building in 2011 with architects Allies and Morrison. The original building was designed for a Phase 2 extension to be added to provide additional lab and office space. The extension is now being built, and will form […]